100 in stock
100 in stock
Ash Grey Short Kurti Palazzo Set
Original price was: ₹3,000.00.₹2,499.00Current price is: ₹2,499.00.
Need a Custom Size? Click here to contact us
Short kurti with a modern, relaxed fit
Paired with comfortable, flowy palazzo pants
Lightweight, breathable fabric for all-day wear
Elegant ash grey tone for a subtle, refined look
A perfect balance of comfort, simplicity, and contemporary elegance.
Description
Subtle, refined, and effortlessly modern, the Ash Grey Short Kurti Palazzo Set is a perfect blend of minimal elegance and everyday comfort. The soft ash tone brings a calm sophistication, making it a versatile choice for both casual and semi-formal wear.
Designed with a contemporary short kurti silhouette paired with a relaxed palazzo, this ensemble offers ease of movement with a polished look. Its understated colour palette enhances its charm, allowing you to style it effortlessly for any occasion.
With its clean lines and graceful simplicity, this set reflects a modern aesthetic rooted in comfort and quiet confidence.
Additional information
| Size | L, M, S, XL, XXL |
|---|
- Wash: Machine wash in cold or warm water (30°C–40°C).
- Dry: Air dry or tumble dry on low heat.
- Iron: Medium heat when damp.
- Wash: Hand wash in cold water with mild detergent or dry clean.
- Dry: Lay flat to dry, do not wring.
- Iron: Lowest setting while damp or use steamer.
- Wash: Hand wash or dry clean.
- Dry: Lay flat and reshape.
- Iron: Steam iron on low heat.
- Wash: Cold water, gentle cycle.
- Dry: Air dry or tumble dry low.
- Iron: High heat while damp.
- Wash: Hand wash in cold water or dry clean.
- Dry: Lay flat or hang to dry.
- Iron: Low heat with cloth.
- Wash: Machine wash inside-out in cold water.
- Dry: Air dry or tumble dry low.
- Iron: Medium heat if needed.
To ensure the longevity of your garment and maintain its quality, please follow the care instructions below.
- Machine Washing: Cold or lukewarm water, gentle cycle.
- Hand Washing: Mild detergent in cold water.
- Drying: Air drying preferred; low heat if using dryer.
- Ironing: Iron inside out with appropriate heat.
Orders are processed within 3–5 business days.
Pre-order items require 15–30 days for dispatch.
No exchange except in case of damage.
Customer must report within 2 days of delivery.
Unboxing video is mandatory.
- Damaged or defective products (report within 1 day)
- Mismatched products
- No exchange for used, washed, or damaged items
Note: Colors may vary slightly due to lighting and screen resolution.


















